Contractor calculators & tools
48+ free calculators for trade estimating, labor costing, pricing, cashflow, and business decisions. Built for contractors who want their pricing built on math, not guesswork.
Newly added
Cabinet
Cabinet pricing by the linear foot — base, wall, tall, island; stock / semi-custom / custom grade; finish multiplier; crown, hardware, install, and countertop add-on.
Stair
Stair design + material takeoff — IRC-compliant riser height and tread depth, stringer count, balusters, handrail, and labor by riser.
Asphalt
Asphalt tonnage + stone base + sealer for new install, overlay, or patch — with crew-hour labor and price-per-sq-ft summary.
Masonry
CMU block and brick veneer takeoff — pieces per sq ft, mortar bags, rebar sticks, and labor for structural and veneer walls.
Sod / Landscape
Sod pallets or rolls, topsoil amendment depth, starter fertilizer, and crew labor — for new lawn installs.
Painting Prep
Paint gallons by spray / roll / brush + surface type + coats, with separate prep-time line by prep severity (light through restoration).
Most popular
Roofing Cost Calculator
Estimate residential roofing jobs including tear-off, decking, underlayment, shingles, and accessories.
HVAC Installation Estimator
Estimate residential HVAC installs by system type, tonnage, and ductwork scope.
Painting Cost Calculator
Estimate interior and exterior painting jobs with prep, material, and labor.
AI Bid Proposal Generator
Generate professional, customer-ready bid proposals from your scope and pricing. Pro feature.
Browse all calculators
Cabinet
Cabinet pricing by the linear foot — base, wall, tall, island; stock / semi-custom / custom grade; finish multiplier; crown, hardware, install, and countertop add-on.
Stair
Stair design + material takeoff — IRC-compliant riser height and tread depth, stringer count, balusters, handrail, and labor by riser.
Asphalt
Asphalt tonnage + stone base + sealer for new install, overlay, or patch — with crew-hour labor and price-per-sq-ft summary.
Masonry
CMU block and brick veneer takeoff — pieces per sq ft, mortar bags, rebar sticks, and labor for structural and veneer walls.
Sod / Landscape
Sod pallets or rolls, topsoil amendment depth, starter fertilizer, and crew labor — for new lawn installs.
Painting Prep
Paint gallons by spray / roll / brush + surface type + coats, with separate prep-time line by prep severity (light through restoration).
Service Upgrade
100A → 200A (or 320A, 400A) service-panel upgrade: panel, breakers, meter, SE cable, grounding, mast, permit, and labor for residential service upgrades.
Plumbing Rough-In
Per-fixture plumbing takeoff — supply LF (PEX or copper), DWV LF, valve count, fitting count, and labor hours by fixture type.
Gutter
Seamless K-style gutter + downspout takeoff with drainage-area sizing rules, corner + end-cap count, and optional leaf-guard.
Window Replacement
Unit-price window replacement by grade (builder vinyl → aluminum-clad wood), insert vs new-construction install, with trim, caulk, flashing, disposal, and labor.
Gas Line
Gas line sizing + material takeoff — BTU-load capacity check, black iron / CSST / polyethylene material, fittings + shutoffs + flex connectors, permit + pressure test + labor.
Retaining Wall
SRW block, poured concrete, or timber-tie retaining-wall material + labor with IRC engineering-threshold warning, base stone, drain pipe, geogrid layers, and cap.
Dumpster
Right-size your dumpster rental — debris volume by project type, recommended 10/15/20/30/40 yard size, base + tonnage + day overage cost.
Demo Scope
Demolition labor-hours + debris-yardage + total cost for kitchen, bath, room-gut, deck, slab, shed, or full-structure demo. Includes containment, utility cutoffs, asbestos abatement.
Septic
Tank capacity (by bedroom count) + drainfield sq ft (by daily flow and soil percolation rate), with conventional, mound, and drip alternative-system pricing.
Paver Patio
Paver, base stone, bedding sand, polymeric jointing, edge restraint, and labor for concrete, brick, stone, or permeable patio installs.
French Drain
Perforated pipe, filter fabric, gravel volume, daylighting, catch basin, and labor for foundation, yard low-spot, downspout, or retaining-wall drainage.
Gravel Driveway
Two-layer crushed-stone driveway — base + surface tonnage by depth + area, excavation, geotextile, edge restraint, and crew labor.
AC Tonnage
Quick AC sizing — climate zone × insulation × sun × windows × occupants → recommended tonnage (1, 1.5, 2, 2.5, 3, 3.5, 4, 5 ton).
Water Heater
Tank-style sizing by first-hour rating (occupants); tankless sizing by GPM × temperature rise. Includes unit cost, install, and hidden tankless-retrofit costs.
Concrete Pour
Estimate concrete by cubic yard, bag count (60 lb + 80 lb), and total material + labor cost for slabs, footings, driveways, sidewalks, and pads.
Drywall
Material takeoff for drywall jobs — sheets, mud buckets, tape, corner bead, and screws — by sheet size and finish level.
Deck Builder
Deck framing + decking + fastener takeoff — joist spacing, board count, post count, and total material cost for PT or composite decks.
Tile
Tile installation takeoff — boxes, thinset, grout, and labor by pattern (straight, diagonal, herringbone, large-format, mosaic).
Fence
Fence material takeoff — posts, panels, footings, and gates by linear foot for wood, vinyl, chain-link, or aluminum.
Siding
Siding material takeoff by the square — gross wall less openings, trim sticks, corner posts, starter strip, fasteners, and labor.
Insulation
Insulation R-value coverage + cost — fiberglass batt, blown-in cellulose, blown-in fiberglass, closed-cell and open-cell spray foam.
Post-Hole
Concrete bags per fence-post hole — diameter, depth, post displacement, and bulk-vs-bag recommendation.
Retainage Cash Flow
Month-by-month cash gap from retainage — peak working-capital strain, carry cost, plain-English verdict, and a counter-offer that restores your margin.
Change Order True Cost
Surface the four hidden costs every change order triggers — direct, schedule disruption, trade-coordination drag, restocking — and compute the quote that holds your at-risk margin.
Waste Factor
Calculate trade-specific waste percentages so you order enough material without over-buying.
Labor Burden
Convert a wage rate into a true burdened cost including taxes, insurance, workers comp, and PTO.
Crew-Day Cost
Calculate the daily cost of a crew including burdened labor, vehicle, fuel, and jobsite overhead.
Rent vs Buy
Find the breakeven utilization point between renting and buying trade equipment.
Shop Rate
Build a defensible shop rate from wage, overhead allocation, and target profit margin.
Markup vs Margin
Convert between markup % and margin %. Most contractors confuse them — this tool prevents the $10k-a-year math error.
Retainage
Model the cashflow impact of retainage on jobs — what you'll be owed at final, and when.
Change Order
Price a change order with extra time, materials, and appropriate markup.
Cost Allocation
Allocate shared overhead (rent, insurance, trucks, admin) across jobs as a burden rate.
Break-Even
Find the minimum job size worth bidding given your crew cost, mobilization, and target margin.
Roofing Cost Calculator
Estimate residential roofing jobs including tear-off, decking, underlayment, shingles, and accessories.
HVAC Installation Estimator
Estimate residential HVAC installs by system type, tonnage, and ductwork scope.
Electrical Service Call Calculator
Price electrical service calls, diagnostic fees, and labor-hour jobs.
Plumbing Job Calculator
Estimate plumbing service calls, fixture installs, and repipe work.
Flooring Cost Calculator
Estimate flooring jobs by material, square footage, and room complexity.
Painting Cost Calculator
Estimate interior and exterior painting jobs with prep, material, and labor.
Invoice Generator
Generate branded contractor invoices from line items with taxes and terms.
AI Bid Proposal Generator
Generate professional, customer-ready bid proposals from your scope and pricing. Pro feature.